Contributo Micron Technology Foundation 2018
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LICCIARDO Gian Domenico (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | Università degli Studi di SALERNO | |
Cost | 9.988,00 euro | |
Project duration | 1 January 2018 - 2 February 2222 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 16.390,78 euro | |
Project duration | 1 October 2012 - 31 December 2099 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MINUTILLO Mariagiovanna (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 75.000,00 euro | |
Project duration | 22 March 2023 - 31 December 2025 | |
Detail |
Active
“Produzione di H2 da CO con WGS a bassa temperatura” - Linea di Attività 1.1.21.
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 80.000,00 euro | |
Project duration | 22 March 2023 - 31 December 2025 | |
Detail |
Active
“Sviluppo, sintesi e fornitura di catalizzatori specifici per reattori di reforming elettrico e idrogassificazione di biomasse”- Linea di Attività 1.1.19-20.
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 160.000,00 euro | |
Project duration | 22 March 2023 - 31 December 2025 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIANESE Cesare (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 90.000,00 euro | |
Project duration | 20 March 2023 - 19 February 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DE MARCO Iolanda (Project Coordinator) REVERCHON Ernesto (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ISTITUTO ZOOPROFILATTICO SPERIMENTALE DEL MEZZOGIORNO | |
Cost | 360.000,00 euro | |
Project duration | 31 December 2022 - 31 December 2024 | |
Proroga | 31 dicembre 2024 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MIRANDA Salvatore (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 60.027,32 euro | |
Project duration | 1 January 2023 - 31 December 2024 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | Dipartimento di Ingegneria ICT e Tecnologie per l'Energia e i Trasporti - CNR-DIITET | |
Cost | 64.993,50 euro | |
Project duration | 5 December 2023 - 31 December 2024 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PATARO Gianpiero (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 100.106,50 euro | |
Project duration | 1 January 2022 - 31 December 2024 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CARLOMAGNO Isabella (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ISTITUTO NAZIONALE DI ALTA MATEMATICA "FRANCESCO SEVERI" | |
Cost | 3.300,00 euro | |
Project duration | 1 February 2021 - 31 July 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MICCIO Michele (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | UFA State Aviation Technical University | |
Cost | 16.260,00 euro | |
Project duration | 1 September 2021 - 1 May 2022 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | REVERCHON Ernesto (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ISTITUTO ZOOPROFILATTICO SPERIMENTALE DEL MEZZOGIORNO | |
Cost | 15.000,00 euro | |
Project duration | 1 February 2022 - 30 April 2022 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 80.000,00 euro | |
Project duration | 1 January 2019 - 31 December 2021 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 100.000,00 euro | |
Project duration | 1 January 2020 - 31 December 2021 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MIRANDA Salvatore (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 75.000,00 euro | |
Project duration | 1 January 2019 - 30 December 2021 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | CONSORZIO INTERUNIVERSITARIO NAZIONALE PER L'INFORMATICA - C.I.N.I. | |
Cost | 195.066,27 euro | |
Project duration | 21 March 2019 - 21 March 2021 | |
Proroga | 21 marzo 2022 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MICCIO Michele (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | CONSIGLIO NAZIONALE DELLE RICERCHE | |
Cost | 40.000,00 euro | |
Project duration | 1 January 2017 - 31 December 2020 | |
Detail |
Contributo ricerca University College of London per attività sulla reologia a caldo di polveri di silicio
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | POLETTO Massimo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 12.100,00 euro | |
Project duration | 1 November 2014 - 31 December 2020 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | COMMISSIONE EUROPEA | |
Cost | 51.875,00 euro | |
Project duration | 10 January 2017 - 9 January 2020 | |
Proroga | 31 dicembre 2020 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | REVERCHON Ernesto (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ISTITUTO ZOOPROFILATTICO SPERIMENTALE DEL MEZZOGIORNO | |
Cost | 120.000,00 euro | |
Project duration | 12 December 2016 - 27 October 2019 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | REVERCHON Ernesto (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ISTITUTO ZOOPROFILATTICO SPERIMENTALE DEL MEZZOGIORNO | |
Cost | 55.000,00 euro | |
Project duration | 27 June 2017 - 27 August 2019 | |
Detail |
Concluded
CONTRIBUTO INDAM ZAPPALE
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ZAPPALE Elvira (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ISTITUTO NAZIONALE DI ALTA MATEMATICA "FRANCESCO SEVERI" | |
Cost | 300,00 euro | |
Project duration | 30 July 2018 - 31 January 2019 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAPRIGLIONE Domenico (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | Università degli Studi di SALERNO | |
Cost | 1.549,37 euro | |
Project duration | 22 November 2016 - 22 November 2018 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LUCCHINI Sacha (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.549,37 euro | |
Project duration | 22 November 2016 - 22 November 2018 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | COMMISSIONE EUROPEA | |
Cost | 70.669,39 euro | |
Project duration | 1 September 2006 - 31 December 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | D'AGOSTINO Francesco (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.000,00 euro | |
Project duration | 1 February 2017 - 31 August 2017 | |
Detail |
Contributo attività Riianova - Miccio
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MICCIO Michele (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | COMMISSIONE EUROPEA | |
Cost | 16.500,00 euro | |
Project duration | 1 September 2016 - 31 July 2017 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | BERARDI Valentino Paolo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | CONSORZIO INTERUNIVERSITARIO RELUIS | |
Cost | 10.200,00 euro | |
Project duration | 25 January 2016 - 31 December 2016 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | POLETTO Massimo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 6.000,00 euro | |
Project duration | 13 September 2011 - 31 December 2016 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 25.000,00 euro | |
Project duration | 1 October 2015 - 30 September 2016 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DONSI' Francesco (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 339,39 euro | |
Project duration | 1 January 2013 - 31 December 2015 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | POLETTO Massimo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 2.700,00 euro | |
Project duration | 29 April 2011 - 31 December 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | NEITZERT Heinrich Christoph (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | COMMISSIONE EUROPEA | |
Cost | 26.000,00 euro | |
Project duration | 26 October 2012 - 31 December 2015 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RIEMMA Stefano (Project Coordinator) | |
Funding | Funds from other research activities | |
Cost | 25.000,00 euro | |
Project duration | 1 October 2001 - 30 December 2015 | |
Detail |
ACCORDO DI COLLABORAZIONE TRA DIIN E ENEA SU "SVILUPPO DI SISTEMI CATALITICI PER IL CLEAN-UP DI BIOCOMBUSTIBILI E RIDUZIONE DELL'IMPATTO AMBIENTALE"
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 53.000,00 euro | |
Project duration | 15 April 2014 - 30 September 2015 | |
Detail |
SVILUPPO E INDUSTRIALIZZAZIONE SISTEMI A RADIOFREQUENZA E FINESTRE ELETTROMAGNETICHE
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RIEMMA Stefano (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 25.000,00 euro | |
Project duration | 7 October 2014 - 20 June 2015 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | POLETTO Massimo (Project Coordinator) | |
Funding | Funds from other research activities | |
Cost | 2.000,00 euro | |
Project duration | 1 January 2013 - 31 December 2014 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile | |
Cost | 25.000,00 euro | |
Project duration | 2 February 2012 - 31 December 2013 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | POLETTO Massimo (Project Coordinator) | |
Funding | Funds from other research activities | |
Cost | 41.042,60 euro | |
Project duration | 1 October 2011 - 1 October 2013 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Cost | 65.000,00 euro | |
Project duration | 15 April 2013 - 30 September 2013 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUIDA Domenico (Responsabile finanziario) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 12.000,00 euro | |
Project duration | 1 January 2011 - 31 December 2012 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI MAIO Luciano (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | CONSIGLIO NAZIONALE DELLE RICERCHE | |
Cost | 8.949,00 euro | |
Project duration | 18 July 2012 - 31 December 2012 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Vincenzo (Project Coordinator) PICCOLO Antonio (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | Università degli Studi di SALERNO | |
Cost | 557.247,66 euro | |
Project duration | 1 January 2009 - 31 December 2011 | |
Proroga | 31 dicembre 2014 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 30.000,00 euro | |
Project duration | 1 September 2010 - 31 December 2011 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | REVERCHON Ernesto (Project Coordinator) | |
Funding | Funds from other research activities | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 2.000,00 euro | |
Project duration | 31 May 2011 - 31 December 2011 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CUCCURULLO Gennaro (Responsabile finanziario) | |
Funding | Funds from other research activities | |
Cost | 1.262.250,00 euro | |
Project duration | 20 December 2006 - 20 December 2007 | |
Detail |
Data source U-GOV dal 1 Gennaio 2013