Research | Projects
Research Projects
170 Funded projects
Filter
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | COLACE Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MINISTERO DELLA SALUTE | |
Cost | 156.599,96 euro | |
Project duration | 1 January 2023 - 31 December 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ALBANESE Donatella (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | BARLETTA Diego (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CARDEA Stefano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CARLONE Pierpaolo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CRICRI' Gabriele (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DE FEO Giovanni (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DE MARCO Iolanda (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | FERRARA Flaminio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GIANNETTI Flavio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GORRASI Giuliana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUERRIERO Rocco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | IANNONE Raffaele (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LAMBERTI Gaetano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LICCIARDO Gian Domenico (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MAIORINO Angelo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MARRA Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | NADDEO Alessandro (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PATARO Gianpiero (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 3.000,00 euro | |
Project duration | 16 March 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUGGIERO Alessandro (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SELLITTO Antonio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SORRENTINO Marco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | VAIANO Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ZAPPALE Elvira (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 1 February 2030 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 0,00 euro | |
Project duration | 1 January 2023 - 31 December 2027 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 2.278.340,00 euro | |
Project duration | 1 January 2023 - 31 December 2027 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | IANNONE Raffaele (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 634.312,50 euro | |
Project duration | 1 July 2024 - 30 June 2027 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero delle imprese e del made in Italy | |
Cost | 995.312,50 euro | |
Project duration | 1 May 2024 - 30 April 2027 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CITRO Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dell'Università e della Ricerca - MUR | |
Cost | 92.000,00 euro | |
Project duration | 4 February 2025 - 4 February 2027 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PROCENTESE Alessandra (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dell'Università e della Ricerca - MUR | |
Cost | 95.747,00 euro | |
Project duration | 4 February 2025 - 4 February 2027 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUIDA Domenico (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero delle imprese e del made in Italy | |
Cost | 631.942,50 euro | |
Project duration | 10 May 2024 - 31 December 2026 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUIDA Domenico (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 240.150,00 euro | |
Project duration | 1 February 2024 - 31 July 2026 | |
Detail |
Active
Affiliato Spoke 2 - Sustainable road vehicle (POLITO)
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SCORZIELLO Luigia (Collaborazione al Coordinatore) GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dell'Università e della Ricerca - MUR | |
Cost | 1.043.750,00 euro | |
Project duration | 1 September 2022 - 28 February 2026 | |
Proroga | 28 febbraio 2026 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 638.128,01 euro | |
Project duration | 1 January 2021 - 31 December 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ALBANESE Donatella (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 100.903,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | BARLETTA Diego (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 118.979,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CARRATU' MARCO (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 97.200,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CITRO Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 67.987,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI PASQUALE VALENTINA (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 100.341,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Alice (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 83.820,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GORRASI Giuliana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 114.000,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUADAGNO Liberata (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 99.056,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | IANNONE Raffaele (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 89.920,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ILLUMINATI Fabrizio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 111.000,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LIGUORI ROSALBA (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 75.000,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MARITATO Luigi (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 119.785,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MINUTILLO Mariagiovanna (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 37.065,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 109.732,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PAPPALARDO Carmine Maria (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 112.000,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SCARFATO Paola (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 113.746,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | TUCCI FAUSTO (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 78.110,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | VAIANO Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 132.887,00 euro | |
Project duration | 30 November 2023 - 30 November 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MINISTERO DELL'AMBIENTE E DELLA TUTELA DEL TERRITORIO E DEL MARE | |
Cost | 540.000,00 euro | |
Project duration | 1 November 2022 - 31 October 2025 | |
Detail |
Affiliato Spoke 8 - Platforms for RNA/DNA delivery (UNINA)
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PACILEO Daniela (Collaborazione al Coordinatore) DE MARCO Iolanda (Project Coordinator) REVERCHON Ernesto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dell'Università e della Ricerca - MUR | |
Cost | 393.875,00 euro | |
Project duration | 1 November 2022 - 31 October 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CARLONE Pierpaolo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 81.500,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DE MARCO Iolanda (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 96.643,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI PASQUALE VALENTINA (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 52.989,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DONSI' Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 89.391,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Alice (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 29.959,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 92.116,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GORRASI Giuliana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 94.641,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUADAGNO Liberata (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 86.820,19 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUIDA Domenico (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 132.000,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | INCARNATO Loredana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 80.896,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Digging into rEversible and irreversible ElectroPoration: in vitro and in silico multiphysical analyses on cEll modelS for cancer Treatment (DEEPEST)
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LIGUORI Consolatina (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 155.000,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LIPAROTI SARA (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 52.333,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MARITATO Luigi (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 256.214,74 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MINUTILLO Mariagiovanna (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 153.970,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 99.000,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SCARFATO Paola (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 117.105,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SEPE Raffaele (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 49.326,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Active
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | VAIANO Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 72.857,00 euro | |
Project duration | 28 September 2023 - 28 September 2025 | |
Detail |
Affiliato Spoke 8 - Circular economy in agriculture through waste valorisation and recycling (UNIMI)
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LUCIANO Michelangelo (Collaborazione al Coordinatore) DONSI' Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dell'Università e della Ricerca - MUR | |
Cost | 384.362,50 euro | |
Project duration | 1 September 2022 - 31 August 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIANESE Cesare (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 202.527,50 euro | |
Project duration | 1 March 2024 - 31 August 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Direttore di Dipartimento) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 499.264,52 euro | |
Project duration | 1 July 2022 - 30 June 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.121.264,52 euro | |
Project duration | 1 July 2022 - 30 June 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | NEITZERT Heinrich Christoph (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 178.797,00 euro | |
Project duration | 19 May 2022 - 19 May 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 235.456,00 euro | |
Project duration | 25 April 2022 - 25 April 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIANESE Cesare (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 150.853,00 euro | |
Project duration | 25 April 2022 - 25 April 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dell'Università e della Ricerca - MUR | |
Cost | 105.750,00 euro | |
Project duration | 1 June 2024 - 31 January 2025 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ALBANESE Donatella (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MINISTERO DELLA SALUTE | |
Cost | 9.500,00 euro | |
Project duration | 14 January 2022 - 31 December 2024 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 374.000,00 euro | |
Project duration | 1 July 2021 - 31 December 2024 | |
Proroga | 31 dicembre 2024 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GIANNETTI Flavio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 247.289,98 euro | |
Project duration | 1 July 2021 - 31 December 2024 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GIANNETTI Flavio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 430.898,59 euro | |
Project duration | 1 July 2021 - 31 December 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ALBANESE Donatella (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 1.030.000,00 euro | |
Project duration | 1 July 2020 - 21 December 2023 | |
Proroga | 21 dicembre 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CARLONE Pierpaolo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 166.431,00 euro | |
Project duration | 15 September 2019 - 15 September 2023 | |
Proroga | 15 settembre 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DONSI' Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 198.731,00 euro | |
Project duration | 15 September 2019 - 15 September 2023 | |
Proroga | 15 settembre 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LIGUORI Consolatina (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 161.080,00 euro | |
Project duration | 15 September 2019 - 15 September 2023 | |
Proroga | 15 settembre 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MIRANDA Salvatore (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 76.050,00 euro | |
Project duration | 15 September 2019 - 15 September 2023 | |
Proroga | 15 settembre 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SCARFATO Paola (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 116.200,00 euro | |
Project duration | 15 September 2019 - 15 September 2023 | |
Proroga | 15 settembre 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | Sabatino Simona (Collaborazione al Coordinatore) GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 846.612,00 euro | |
Project duration | 1 January 2018 - 31 July 2023 | |
Proroga | 31 Luglio 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 996.310,00 euro | |
Project duration | 1 January 2018 - 31 July 2023 | |
Proroga | 31 Luglio 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GORRASI Giuliana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 144.876,00 euro | |
Project duration | 15 September 2019 - 15 March 2023 | |
Proroga | 15 marzo 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIANESE Cesare (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 156.600,00 euro | |
Project duration | 15 September 2019 - 15 March 2023 | |
Proroga | 15 marzo 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | FERRARI Giovanna (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 1.575.046,75 euro | |
Project duration | 6 August 2019 - 6 January 2023 | |
Proroga | 6 dicembre 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUGGIERO Alessandro (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 147.902,00 euro | |
Project duration | 15 September 2019 - 15 September 2022 | |
Proroga | 15 marzo 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI MAIO Luciano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 360.000,00 euro | |
Project duration | 1 September 2019 - 30 August 2022 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ILLUMINATI Fabrizio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 135.200,00 euro | |
Project duration | 29 August 2019 - 29 August 2022 | |
Proroga | 28 febbraio 2023 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MICCIO Michele (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 13.000,00 euro | |
Project duration | 16 November 2018 - 16 May 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 797.600,00 euro | |
Project duration | 1 February 2018 - 30 April 2022 | |
Proroga | 30 aprile 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MIRANDA Salvatore (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 1.057.000,00 euro | |
Project duration | 1 September 2018 - 28 February 2022 | |
Proroga | 28 febbraio 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 154.000,00 euro | |
Project duration | 1 June 2019 - 31 December 2021 | |
Proroga | 30 novembre 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 570.000,50 euro | |
Project duration | 1 January 2019 - 20 December 2021 | |
Proroga | 30 giugno 2022 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | VAIANO Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 150.000,00 euro | |
Project duration | 14 October 2019 - 5 November 2021 | |
Proroga | 5 novembre 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 400.000,00 euro | |
Project duration | 1 January 2019 - 10 August 2021 | |
Proroga | 30 ottobre 2021 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 565.000,00 euro | |
Project duration | 28 February 2016 - 30 June 2021 | |
Proroga | 31 ottobre 2021 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | REVERCHON Ernesto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 61.000,00 euro | |
Project duration | 16 November 2018 - 15 May 2021 | |
Detail |
valore complessivo del progetto € 980.000: Capofila DIP. CHIMICA E BIOLOGIA € 745.950 Partner DIP. INGEGNERIA INDUSTRIALE € 234.050
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | VAIANO Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 160.050,00 euro | |
Project duration | 16 November 2018 - 15 May 2021 | |
Proroga | 15 maggio 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MIRANDA Salvatore (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 524.800,00 euro | |
Project duration | 1 September 2018 - 28 February 2021 | |
Proroga | 28 febbraio 2022 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | COLACE Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.300.000,00 euro | |
Project duration | 15 February 2018 - 28 February 2021 | |
Proroga | 28 febbraio 2022 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Ministero dello Sviluppo Economico | |
Cost | 730.000,00 euro | |
Project duration | 1 January 2016 - 31 December 2020 | |
Proroga | 30 giugno 2021 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIETROSANTO Antonio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 850.000,00 euro | |
Project duration | 1 July 2018 - 31 December 2020 | |
Proroga | 30 giugno 2021 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CHIADINI Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 728.548,00 euro | |
Project duration | 1 March 2018 - 31 August 2020 | |
Proroga | 31 agosto 2021 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | COLACE Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 423.514,00 euro | |
Project duration | 15 February 2018 - 15 August 2020 | |
Proroga | 28 febbraio 2022 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DE SANTO Massimo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 1.000.000,00 euro | |
Project duration | 1 November 2017 - 31 July 2020 | |
Proroga | 30 giugno 2021 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | D'AMBROSIO Francesca Romana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | Università degli Studi di SALERNO MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 75.865,00 euro | |
Project duration | 5 February 2017 - 5 February 2020 | |
Detail |
FONDI FINANZIAMENTO ATTIVITA' BASE RICERCA 2017
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DONSI' Francesco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 3.000,00 euro | |
Project duration | 16 February 2018 - 31 December 2018 | |
Detail |
Concluded
Progetto congiunto PANN15T2_00135 C.D.D.22/12/2016
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | POLETTO Massimo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 5.000,00 euro | |
Project duration | 1 January 2017 - 31 December 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIANESE Cesare (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 71.440,00 euro | |
Project duration | 1 July 2014 - 31 December 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SARNO Maria (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 242.400,00 euro | |
Project duration | 1 October 2013 - 30 September 2017 | |
Proroga | 30 settembre 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 557.000,00 euro | |
Project duration | 10 October 2013 - 30 September 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.074.884,41 euro | |
Project duration | 1 October 2013 - 30 September 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 90.181,81 euro | |
Project duration | 10 October 2013 - 30 September 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 532.400,00 euro | |
Project duration | 1 October 2013 - 30 September 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIETROSANTO Antonio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.407.000,00 euro | |
Project duration | 31 December 2014 - 30 September 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIETROSANTO Antonio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 432.900,00 euro | |
Project duration | 1 October 2013 - 30 September 2017 | |
Proroga | 30 settembre 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GALDI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 87.000,00 euro | |
Project duration | 1 May 2014 - 30 September 2017 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIANESE Cesare (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 8.220,00 euro | |
Project duration | 1 July 2014 - 30 June 2017 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GIORDANO Anna (Collaborazione al Coordinatore) DE SANTO Massimo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 0,00 euro | |
Project duration | 1 November 2013 - 30 April 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SARNO Maria (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 144.924,50 euro | |
Project duration | 1 November 2013 - 30 April 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GIORDANO Anna (Collaborazione al Coordinatore) DE SANTO Massimo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 0,00 euro | |
Project duration | 1 November 2013 - 30 April 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GIORDANO Anna (Collaborazione al Coordinatore) DE SANTO Massimo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 0,00 euro | |
Project duration | 1 November 2013 - 30 April 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RIEMMA Stefano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 163.425,50 euro | |
Project duration | 1 November 2013 - 30 April 2017 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 11.516,00 euro | |
Project duration | 1 October 2013 - 30 March 2017 | |
Detail |
2012JWPMN9_003 BANDO PRIN 2012 PANTANI
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 45.840,00 euro | |
Project duration | 8 March 2014 - 7 March 2017 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GIORDANO Anna (Collaborazione al Coordinatore) DE SANTO Massimo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 445.204,56 euro | |
Project duration | 1 November 2013 - 31 December 2016 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PIANESE Cesare (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 183.750,00 euro | |
Project duration | 1 July 2014 - 31 December 2016 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | GUADAGNO Liberata (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 395.840,00 euro | |
Project duration | 1 September 2011 - 31 August 2016 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 216.934,00 euro | |
Project duration | 31 December 2012 - 29 February 2016 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAPUTO GIUSEPPE (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 180.000,00 euro | |
Project duration | 31 January 2013 - 22 February 2016 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LAMBERTI Gaetano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 239.593,00 euro | |
Project duration | 31 January 2013 - 1 February 2016 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | ILLUMINATI Fabrizio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 112.369,00 euro | |
Project duration | 31 January 2013 - 1 February 2016 | |
Detail |
Concluded
PRIN ANNO 2010 RESP. PROF. LUIGI MARITATO
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | MARITATO Luigi (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 74.400,00 euro | |
Project duration | 1 February 2013 - 1 February 2016 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 652.500,00 euro | |
Project duration | 26 November 2012 - 31 January 2016 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.250.001,81 euro | |
Project duration | 1 July 2011 - 31 December 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | REVERCHON Ernesto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 1.737.510,00 euro | |
Project duration | 1 September 2011 - 31 December 2015 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 255.000,00 euro | |
Project duration | 1 May 2014 - 31 December 2015 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RIZZO Gianfranco (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 170.503,00 euro | |
Project duration | 2 January 2014 - 31 December 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 4.372,00 euro | |
Project duration | 8 February 2015 - 9 December 2015 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 14.028,00 euro | |
Project duration | 10 October 2013 - 9 December 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI MAIO Luciano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | COMMISSIONE EUROPEA | |
Cost | 162.000,00 euro | |
Project duration | 26 October 2014 - 30 November 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 727.500,00 euro | |
Project duration | 26 November 2012 - 26 November 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PANTANI Roberto (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 430.494,00 euro | |
Project duration | 1 July 2012 - 1 July 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI MATTEO Marisa (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.261.001,81 euro | |
Project duration | 1 April 2012 - 30 June 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 102.820,00 euro | |
Project duration | 23 September 2013 - 1 June 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RUBINO Alfredo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 20.850,00 euro | |
Project duration | 23 September 2013 - 1 June 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI MATTEO Marisa (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 441.162,19 euro | |
Project duration | 1 April 2012 - 31 May 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 238.506,00 euro | |
Project duration | 1 April 2013 - 31 May 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PALMA Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 287.102,19 euro | |
Project duration | 1 July 2011 - 30 May 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | DI MAIO Luciano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 122.400,00 euro | |
Project duration | 29 October 2014 - 28 February 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | INCARNATO Loredana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | REGIONE CAMPANIA | |
Cost | 1.315.001,81 euro | |
Project duration | 15 October 2011 - 19 February 2015 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | PICCOLO Antonio (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 1.271.298,00 euro | |
Project duration | 1 January 2011 - 31 December 2014 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RIEMMA Stefano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 10.513.754,38 euro | |
Project duration | 3 November 2011 - 31 December 2014 | |
Detail |
Concluded
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RIEMMA Stefano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 886.245,62 euro | |
Project duration | 2 May 2012 - 2 December 2014 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | SERGI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 66.202,00 euro | |
Project duration | 1 October 2011 - 30 September 2014 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | CAIAZZO Fabrizia (Project Coordinator) SERGI Vincenzo (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 866.065,00 euro | |
Project duration | 1 October 2011 - 30 September 2014 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | INCARNATO Loredana (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 71.998,19 euro | |
Project duration | 15 October 2011 - 9 May 2014 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | RIEMMA Stefano (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Cost | 490.380,00 euro | |
Project duration | 5 November 2011 - 5 May 2014 | |
Detail |
Department | Dipartimento di Ingegneria Industriale/DIIN | |
Principal Investigator | LIGUORI Consolatina (Project Coordinator) | |
Funding | Finanziamenti da bandi nazionali Ministeriali ed altri EEPP | |
Funders | MIUR - MINISTERO DELL'ISTRUZIONE DELL'UNIVERSITA' E DELLA RICERCA | |
Cost | 73.864,00 euro | |
Project duration | 17 October 2011 - 11 November 2013 | |
Detail |
Data source U-GOV dal 1 Gennaio 2013